The sidewalk on N. Glebe Road adjacent to the Harris Teeter redevelopment site will close in mid-January.
Alternate pedestrian routes:
- Sidewalk on the opposite side of Glebe Road.
- Temporary path between N. Thomas Street and the Harris Teeter parking lot. The path will travel through the construction site between The Springs (APAH building) and the Ballston Crest townhouses.
